top of page

The third semester was about working on a Multi-purpose hall. We were a group of four people working during the semester. Myself, Frederik, Andris and Vu. The building was a sports hall with a coffee shop. The two separate constructions were made, one of concrete, while the other was made out of wood, and we were given the option to chose with which construction we want to worker for the rest of the semester.

It was the time I was introduced to the tendering phase of a project. After we chose to work on the wooden building, we established a company called DAWO as the contractor and Woodways as the subcontractor. In the process, we worked closed with the University of Aarhus students, coming up with the proper tendering documents, and exchanged them with each other, while correcting and assessing each-others projects. 

3rd Semester

Documents
bottom of page